成人毛片免费观看视频大全-成人毛片免费观看视频在线-成人毛片免费看-成人毛片免费视频-成人毛片免费视频播放-成人毛片免费网站

Contact Us   
Search   

How to Install a Floating Ball Valve ?

2013/11/10      view:

A floating ball valve in your pipeline often needs to be changed and substituted by a new one for repair or renovation purposes. Instead of spending money in hiring professional plumbers, a simple guide shall teach you how to install them all by yourself, saving money as well as precious time.

Step 1: Initial Steps

Before you start, disconnect the water supply to the toilet and flush out the water entirely. This will empty your cistern which is necessary for replacing and installing a floating ball valve.

Step 2: Locate the Point of Installation

You need locate the exactly place where the floating ball valve is set up. Carefully open up the lid of the cistern and keep it aside so that there are no chances of it cracking up. Locate the lever of the flush and pull it out with care that it does not break. If you have a button flush, simply loosen the screws and take it out.

Step 3: Uninstalling the Valve

Take a good look at the internal set up of the cistern and valve components. The float arm is connected to the ball-shaped valve, which has the pin like structure attached. Apply light pressure to make this pin straight. This way the valve sits loose. Next, the cap-like end of the cylinder inside, called the piston, too can be removed after the valve comes off. Sometimes due to long use, the piston gets jammed and does not come off easily. In such a case, apply some lubricant after unscrewing the end part of the piston and leave the oil to work its effect. In about an hour, try removing the piston, it should come off without much difficulty.

Step 4: Install New Valve

Purchase a new floating valve kit from a hardware shop. Read the instructions on its backside before starting the installation process. Clean up the piston stem using a piece of wire wool to rid it off any clogged fragments. Connect the pin to the piston after screwing in the washer. Now the end of the pin that is free must be inserted into the valve. Next the valve must be connected to the floating arm in the place that has a dent made already. You can apply some petroleum to the thread of the piston so that it remains smooth for some time.

Step 5: Final Step

Re-establish the water connection and fill the cistern with water. Check for any leaks or seepage of the water. If no problems are seen, then the installation is a success. Put the cistern flush by screwing it up and place the cistern lid back into place. Check for any water seeping through the flush as well. Your floating ball valve is all set up. Make sure that you do not apply too much pressure on any part during the installation procedure. It might lead to major cracks that could burn a hole into your pocket if it needs to be replaced.

主站蜘蛛池模板: 欧美亚洲国产另类 | 四虎免费紧急入口观看 | 狠狠色丁香婷婷综合激情 | 久久国产精品亚洲一区二区 | 亚洲一区欧美日韩 | 久久国产视频精品 | 亚洲日本aⅴ片在线观看香蕉 | 精品中文字幕一区二区三区四区 | 欧美另类黑人巨大videos | 免费观看日本污污ww网站精选 | 亚洲国产成人精品一区91 | 日本一本久 | 久草免费公开视频 | 夜夜天天干 | 日韩精品亚洲人成在线观看 | 久热在线视频精品网站 | 97se亚洲综合在线天天 | 亚洲福利社 | 国产亚洲精品国产福利在线观看 | 亚洲精品欧美精品一区二区 | 日本黄 色 成 年 人免费观看 | 天天久久狠狠伊人第一麻豆 | 亚洲不卡在线 | 免费在线不卡视频 | 天天草夜夜爽 | 欧美日韩中文在线视频 | 五月天精品 | 国产综合在线播放 | 久久99精品这里精品3 | 国产自愉怕一区二区三区 | 四虎在线网址 | chinese国产在线视频 | 日韩在线免费视频观看 | 色吧五月婷婷 | 在线观看人成午夜影片 | 成 人 免 费 黄 色 | 91福利视频免费观看 | 97影院理论午夜论不卡 | 高清毛片免费看 | 女人十八毛片免费特黄 | 成人午夜视频网站 |